0

I would like to order the variable "test" by the largest OR.

structure(list(test = c("a", "b", "c", "d", "e", "f", "g"), OR = c(2.78, 
1.74, 1.32, 1.16, 0.92, 0.75, 0.53), LowerLimit = c(2.11, 0.96, 
1.11, 0.74, 0.61, 0.52, 0.4), UpperLimit = c(3.72, 3.25, 1.58, 
1.85, 1.4, 1.09, 0.71), Group = 1:7), class = "data.frame", row.names = c(NA, 
-7L)

p = ggplot(data=table,
       aes(x = reorder (test, -OR), y = OR, ymin = LowerLimit, ymax = UpperLimit )) +
geom_pointrange(aes(col=test), size = 1.5)+
  geom_hline(aes(fill=test),  yintercept =1, linetype=2)+
  xlab('test')+ 
  ylab("Odd's Ratio (95% Confidence Interval)")+
  geom_errorbar(aes(ymin=LowerLimit, ymax=UpperLimit,col=test),width=0.5,cex=1)+ 
  facet_wrap(~test,strip.position="left",nrow=9,scales = "free_y") +
  theme(plot.title=element_text(size=16,face="bold"),
    axis.text.y=element_blank(),
    axis.ticks.y=element_blank(),
    axis.text.x=element_text(face="bold"),
    axis.title=element_text(size=12,face="bold"),
    strip.text.y = element_text(hjust=0,vjust = 1,angle=180,face="bold"))+
  coord_flip()
p

I have reviewed this post Order Bars in ggplot2 bar graph

I have tried the reorder command and also the example of creating a "positions" list and neither work.

sar
  • 152
  • 3
  • 23

1 Answers1

1

This works as expected if you reorder the variable test first, rather than trying to mutate your data inside the aes function.

Compare this:

table %>% 
  mutate(test = reorder(test, OR)) %>%       
  ggplot(aes(x = test, y = OR, ymin = LowerLimit, ymax = UpperLimit )) +
  geom_pointrange(aes(col = test), size = 1.5) +
  geom_hline(yintercept = 1, linetype = 2) +
  geom_errorbar(aes(ymin = LowerLimit, ymax = UpperLimit, col = test),
                width = 0.5, cex = 1) + 
  coord_flip() +
  facet_wrap(~test, strip.position = "left", nrow = 9, scales = "free_y") +
  xlab('test') + 
  ylab("Odds Ratio (95% Confidence Interval)") +
  theme(plot.title   = element_text(size=16,face="bold"),
        axis.text.y  = element_blank(),
        axis.ticks.y = element_blank(),
        axis.text.x  = element_text(face="bold"),
        axis.title   = element_text(size=12,face="bold"),
        strip.text.y = element_text(hjust = 0, vjust = 1,
                                    angle = 180, face = "bold"))

enter image description here

To exactly the same code with a - sign in front of OR inside reorder:

table %>% 
  mutate(test = reorder(test, -OR)) %>%       
  ggplot(aes(x = test, y = OR, ymin = LowerLimit, ymax = UpperLimit )) +
  geom_pointrange(aes(col = test), size = 1.5) +
  geom_hline(yintercept = 1, linetype = 2) +
  geom_errorbar(aes(ymin = LowerLimit, ymax = UpperLimit, col = test),
                width = 0.5, cex = 1) + 
  coord_flip() +
  facet_wrap(~test, strip.position = "left", nrow = 9, scales = "free_y") +
  xlab('test') + 
  ylab("Odds Ratio (95% Confidence Interval)") +
  theme(plot.title   = element_text(size=16,face="bold"),
        axis.text.y  = element_blank(),
        axis.ticks.y = element_blank(),
        axis.text.x  = element_text(face="bold"),
        axis.title   = element_text(size=12,face="bold"),
        strip.text.y = element_text(hjust = 0, vjust = 1,
                                    angle = 180, face = "bold"))

enter image description here

Allan Cameron
  • 91,771
  • 6
  • 28
  • 55
  • If I had multiple pairs (eg. a+b, c+d, e+f) and I wanted to group by the pair and also put a uniform color for each pair, only one lighter than its pair to contrast, how could I do that? – sar Oct 02 '20 at 16:33
  • 1
    @sar that's not a question that can easily be answered in the comments. Do you think you could post a new question with an example? – Allan Cameron Oct 02 '20 at 16:35
  • @Allen Cameron is there is a simple way to allocate colors to each variable? eg. substitute col="test" with a list of colors? When I try this I can't seem to override the ordering of the variables – sar Oct 07 '20 at 22:24
  • 1
    @sar you could do `+ scale_color_manual(values = c("red", "blue", "green", "gold", "black"))` etc. The number of colours should match the number of levels of your coloured variable – Allan Cameron Oct 07 '20 at 22:36