0

I have a string "ATCGATCG" and I want it to be reversed so its "GCTAGTCA". I thought about using:

data_r2[total:]+s[0] 

Where total is the result from a counting script I have which will count the number of characters in the string. I realise that this will rotate the string and just end up with the same order if totally rotated which isn't what I want at all.

Does anyone know how to do this so it is the input string reversed so the right most character is now the left most character etc?

Ffisegydd
  • 47,839
  • 14
  • 137
  • 116
thh32
  • 77
  • 2
  • 7

2 Answers2

1
"ATCGATCG"[::-1] == "GCTAGCTA"

This uses slice notation, from the start to the end stepping by negative one.

Adam Smith
  • 48,602
  • 11
  • 68
  • 105
  • 1
    It's also probably a million different duplicates on SO :) – Adam Smith May 02 '14 at 16:33
  • This doesn't produce the OP's desired output. He could have made a typo though... –  May 02 '14 at 16:33
  • @iCodez ha I didn't actually read the desired output! I'm assuming that MUST be a typo. If not, please let me know OP and further clarify your question – Adam Smith May 02 '14 at 16:34
  • Yeah it was a typo, as I said I wanted to reverse the string which this does so thank you so much for this. – thh32 May 02 '14 at 19:22
0

Alternative but slower way.

In [2]: s="ATCGATCG"

In [3]: ''.join(reversed(s))
Out[3]: 'GCTAGCTA'
Padraic Cunningham
  • 168,988
  • 22
  • 228
  • 312